OPC= Ordinary Portland Cement.
PPC;- Pozzolonic Portland Cement.
(Fyi: PPC is environment friendly as it consists fly ash in specific percentages by parts , which is a waste product of burnt coal, usally collected from thermal power plants)OPC(m53) attains strength in a shorter time, while PPC (m43) takes longer.
OPC therfore dries more quickly, but produes more heat during chemical during which gains strength, as compared to PPC
Faster is the drying process, more is the risk of cracking of cement , and therefore it need more care and more amount of watre for curing in a lesser time.
PPC on the other hand can attain strength eaqual to OPC, But it takes a longer time.
For a building slab, PPC is more widely used since it requires less care.
The strength depends on design mix(the water cemnet and aggregate ratio) more than type of cement.
So essentially , if you need construction to take olace faster and have means for good curing , you may use OPC.
But if you need bettre quality and strength in less effort ,use OPC.
It still depends on the structure`s design requirements and a structural designer`s advice is to be followed.
Hope this helps, but do consult an engineer before using any tyoe of cement.
Building construction is a responsible job and needs to be done safely and one must adhere to engineer`s specifications .
But you can always ask questions for necessity of specified materials and design.
Best the OPC and PPC for RCC slabs of varying sizes and thickness.
My Views are;
PPC is economically better than OPC.
Strengthwise , PPC is always grade 33(although this is never mentioned on the bag) whereas OPC is available in grade 43 & 53
The setting process of PPC is slower than OPC and hence the striking off period for the form work gets extended by about 50%
PPc has relatively low heat emission process as compared to OPC and hence the finer shrinkage cracks which are normally seen on
RCC slabs cast with higher grade cement are not seen with PPC.
In a case, a normally mix is used for concrete (say 1:1:5:3), which assumes grade 33 cement is used,
PPC matches the strength requirements.
If Design mix is opted , the laboratory does consider the exact strength available from the specfic brand/grade of cement being deployed.
Thus use of OPC or PPC cement shall be peoperly weighed in the design mix.
In the backdrop of this, my preferred use shall be PPC at site since:
Comments
Post a Comment